Petrofac · Abu Dhabi, AE
Posted:
Responsible For: Responsible for managing site construction activities and supervising field personnel for M echanical / HVAC, Piping, Painting, Insulation, Refractory and Fireproofing Main purpose of role: Take decisions relating to allocated work scope related to Mechanical / HVAC and Piping to ensure safe completion to schedule, quality and budget. KEY ACCOUNTABILITIES: The Senior Construction Engineer – Mechanical is responsible for managing subcontractor and supervising construction activities related to M echanical / HVAC, Piping, Painting, Insulation, Refractory and Fireproofing. · Works to a 90 day look ahead schedule and direct all field personnel and subcontractors to achieve completion of the project on schedule, with quality workmanship that conforms to plans and specifications. · Ensure all work is executed in compliance with Contract requirements, Petrofac Management System requirements and associated procedures and all relevant standards and national and international standards, as appropriate. · Contribute to the development of plans, schedules and estimate for individual work scope. · Ensure Go/NoGo checklist is signed off and enough Workfront is available prior to mobilisation of Subcontractor. · Verify the Subcontractor’s execution plan at an early stage and approve only if it aligns with Petrofac deliverables (documents and materials). Challenge Subcontractor for a more efficient execution plan inline within schedule & inline with safety and quality requirement. · Prepare and discuss with subcontractor in advance construction method, sequence of works for critical activities. · Initiate scoping sessions with subcontractors to plan activities (be aware of workface planning) · Contribute to construction schedule and 6-weeks look-ahead, understand the project plans and specifications, identify and solve problems, order materials and schedules inspections as necessary throughout the process. · Coordinate with Engineering & PMT to ensure that planned activities are constraints free. · Review work procedures and method statements for M echanical / HVAC, Piping, Painting, Insulation, Refractory and Fireproofing works in compliance with good work practices and the customers contract specializations. · Ensure subcontractors are working with latest issued documents and drawings. Review IFC documents and resolve discrepancies, raise technical queries for clarifications on IFC deliverables in coordination with field engineering team. · Implement standardized construction work processes, procedures, manuals and systems and create a system of control in each specific area. · Ensure adequate storage and preservation of equipment & bulks before and after installation. · Understands the systems turnover plan and sequence and ensures that the work is performed accordingly. · Takes ownership of Build Right First Time (QinC) as nominated by CD/SM. Ensures that all inspection reports are accurate and that all attached documents are current status. Actively participate in Quality control inspection for all type of M echanical / HVAC, Piping, Painting, Insulation, Refractory and Fireproofing works in line with approved ITP’s. · Monitor implementation of PPC (daily progress monitoring). Daily progress report to be submitted to line manager. · Highlight to Construction Manager & Subcontractor in advance on area of concern that might have an impact on project execution. Review daily/weekly job progress report and cost reports and issue to line management for ensuring progress and managing slippage in coordination with mechanical construction. · Coordinate with the Client / QC inspectors for the resolution of site problems. · Liaise with other disciplines in the execution of work. · Assist the site subcontractors in the resolution of drawing interpretation. · The review of inspection test packages during the course of construction activities. · Monitor calibration status and condition of Inspection/Test and Measuring instruments. · Ensures closure of all RFIs and related inspection/test records (ITRs) immediately after successful completion of each inspections with minimum/no punchlist · Monitor completion of system/sub system in his area based on previously forecasted ITRs. · Ensure that all punch items are closed on timely basis and assist in commissioning plan. · Attend subcontract/cost awareness sessions and understand the Responsibility matrices, BOQ & preambles of subcontract. Shall provide assistance to subcontract teams on payment and invoice clearance in accordance with the BOQ and guide/manage sub-contractor change requests by complete assessment of works in the interest of the company within the framework of the subcontract. · Ensure quantity reporting is establish and reported accurately. · Challenge every Site Instruction based on Ts and Cs and assess cost impact prior to approval. Be aware of contract Ts & Cs of the subcontractor and scope of responsibilities. · Conduct a review of all Site Instructions & Variation Orders (issued, approved, rejected) with Subcontracts Manager on a monthly basis. Keep evidences of changes requested. · Immediately report any cost affecting inspection results to discipline lead and also highlight to engineering. Ensure all design changes are captured by the change control process.